可调节负荷资源参与电网调控的思考与技术实践
作者:
作者单位:

国家电网公司华北分部,北京市100053

摘要:

随着新能源规模的发展和电网特性的变化,传统调节资源的调度空间越来越小,亟须有效拓展电网调节资源,推动“源随荷动”传统模式向“源荷互动”协同模式转变。在未改变现有智能电网调度控制系统结构的前提下,提出了可调节负荷资源参与电网调控的技术架构和若干技术。可调节负荷资源通过聚合商运营平台汇聚后与调度端负荷调控平台对接,构建调控机构-聚合商-负荷资源三级业务体系,实现调控机构与聚合商的监视、控制和市场等数据的实时交互,支撑负荷资源通过功率连续调节参与全网调度优化。中国华北电网对北京地区有序充电桩和分布式储能集群开展了168 h闭环控制,验证了文中所提技术路线的可行性。该路线陆续支撑了多个第三方负荷主体参与华北调峰辅助服务市场。最后,对大规模可调节负荷资源参与电网调控需面对和解决的技术问题进行了思考和展望。

关键词:

基金项目:

通信作者:

作者简介:


Thinking and Technical Practice of Adjustable Load Resources Participating in Dispatching and Control of Power Grid
Author:
Affiliation:

North China Branch of State Grid Corporation of China, Beijing 100053, China

Abstract:

With the rapid development of new energy and the change of grid characteristics, the dispatching space of traditional adjustable resources becomes smaller. It is urgent to effectively expand the adjustable resources of power grid and promote from the traditional passive "source changing with load" mode to the collaborative " interaction between source and load " mode. Under network security requirements, this paper proposes the technical architecture and some technologies of adjustable load participating in dispatching and control of power grid without changing the structure of existing dispatching and control system of smart grid. After converged on the aggregator's operation platform, the adjustable load resources are connected to the load dispatching and control platform. A three-level business system of dispatching and control center-aggregator-adjustable load is constructed, so as to realize the interactions of monitoring, control, market and other information between dispatching and control center and aggregators, and support the load participating in the whole grid dispatching and optimization through continuous power regulation. The 168 hour closed-loop control of orderly charging piles and distributed energy storage clusters in Beijing is conducted by the North China grid, the technical route is verified to be feasible. This route helps several adjustable load aggregators participating in peak-shaving auxiliary service market of North China grid. Finally, the technical problems after large-scale adjustable load widely participating in power grid regulation are thought and prospected.

Keywords:

Foundation:
引用本文
[1]宁剑,江长明,张哲,等.可调节负荷资源参与电网调控的思考与技术实践[J/OL].电力系统自动化,http://doi. org/10.7500/AEPS20191226007.
NING Jian, JIANG Changming, ZHANG Zhe, et al. Thinking and Technical Practice of Adjustable Load Resources Participating in Dispatching and Control of Power Grid[J/OL]. Automation of Electric Power Systems, http://doi. org/10.7500/AEPS20191226007.