1.Key Laboratory of the Ministry of Education on Smart Power Grids (Tianjin University), Tianjin 300072, China;2.Georgia Tech Shenzhen College, Tianjin University, Shenzhen 518055, China
Current research on 5G base stations as flexible resources to participate in power grid interaction mostly focuses on the utilization of energy storage resources of 5G base station, ignoring the regulatory potential of 5G base station communication load. Therefore, a day-ahead interactive operation method for distribution network operator (DNO) and mobile network operator (MNO) based on inter-station migration of communication load is proposed. Firstly, a DNO-MNO dual-layer interactive operation optimization model is constructed. In this model, DNO is an incentive strategy that comprehensively considers the system network loss cost and the incentive cost of the 5G base station, and takes the system
[1] | LIU Hong, WANG Zhijie, XU Zhengyang, et al. Day-ahead Interactive Operation Method for Distribution Network and 5G Base Stations Based on Inter-station Migration of Communication Load[J]. Automation of Electric Power Systems,2024,48(21):82-91. DOI:10.7500/AEPS20240202004 |